Donegal County Council Logo
Home > Services > Roads Service > Roads Service Public Consultation > Millbrae Footpath

Millbrae Footpath

It is proposed to construct a footpath at Millbrae to enhance safety, functionality and connectivity for pedestrians and vulnerable road users in the area and provide additional capacity to meet the full development aspirations for Stranorlar.

 

The project will include:

  • A new 3m wide footpath on the eastern side of Millbrae from the N15 junction at Mc Clays Corner to Finn Valley A.C
  • Provision of a new uncontrolled crossing on Millbrae at the N15 Junction at Mc Clays Corner
  • Provision of a controlled crossing on Millbrae at the Finn Valley A.C
  • Upgrades to existing uncontrolled crossings at Ard McCool and Railway Road Junctions
  • Realignment of Junction radii as appropriate
  • New road markings, signage, drainage works, landscaping and accommodation works
  • New public street lighting on Millbrae
  • New road alignment in order to standardise parallel parking at Millbrae Terrace

 

The project will be carried out in accordance with section 38 of the Road Traffic Act 1994.

 

NOTE: Due to Covid 19 restrictions currently in place, viewing of the plans and particulars for this proposed development will only be available for inspection or download below.

 

Alternatively you can contact our Customer Service Centre on (074)91 53900 to find out more about the Proposed Works.

 

The proposals will be available for inspection from 9.00am Monday 29th June 2020 to 5.00pm Monday 27th July 2020.

 

Submissions and observations with respect to the proposed development, dealing with the proper planning and development of the area in which the development is situated may be made in writing to The Co. Secretariat Office, Donegal County Council, Lifford, County Donegal, before 4.00pm on Monday 10th August 2020.

 

Note that in accordance with Article 120(1)(b)(i) of the Planning and Development Regulations 2001 (as amended) Donegal County Council has concluded, based on a preliminary examination of the nature, size and location of the development, that an Environmental Impact Assessment (EIA) is not required.


Please mark the front of the envelope with the project name as per the above schedule.

 

P1017 Millbrae Part 8 Report (2)

P1017 Millbrae Screening Report (1)

P1017 Mill Brae Footpath Drawings

Rate this Page

Select an option below

Map Services

Map Portal

  • winterweather Image
  • NWGreenway network icon
  • Donegal Tourism Logo
  • Rennet Image
  • NPPR Logo
  • Donegal Gathering Logo
  • Donegal Diaspora Logo
  • Public Art logo
  • Regional Cultural Centre logo
  • Spaceial logo
  • IrishWater
  • LEO